BIM Coordination & Clash Detection

Ensuring a Conflict-Free Path to Construction Excellence

Prevent costly delays, reworks, and budget overruns with our expert BIM Coordination & Clash Detection services. We proactively identify and resolve design conflicts before they escalate on the construction site, fostering a truly collaborative environment among all disciplines.

Three engineers reviewing a federated building model on a wall screen with a duct and beam clash highlighted

What We Offer

Our meticulous approach ensures a streamlined construction process, leading to smoother execution and significant savings in time and resources.

A

Unified Model Creation

Consolidating architectural, structural, MEPF, and other specialty models into a single, comprehensive federated model for holistic review.

B

Hard & Soft Clash Detection

Hard Clashes: identifying direct geometric intersections between building elements. Soft Clashes: detecting instances where required clearance zones are violated.

C

Workflow Optimization

Establishing clear coordination processes, meeting schedules, and communication protocols among all project stakeholders.

D

Clash Reporting & Management

Generating detailed clash reports, prioritizing issues, and tracking their resolution through iterative coordination meetings.

E

Issue Tracking & Resolution

Utilizing advanced BIM software (e.g., Navisworks) to manage issues, assign responsibilities, and monitor progress until resolution.

F

Coordination Meetings

Facilitating and leading virtual coordination meetings, providing clear visuals and actionable insights to resolve conflicts collaboratively.

Outcomes

Benefits Of Our BIM Coordination & Clash Detection

Significant Cost Savings

Prevent expensive on-site reworks and material waste by resolving issues in the design phase.

Reduced Project Delays

Streamline construction schedules by eliminating unforeseen conflicts and associated stoppages.

Enhanced Collaboration

Foster a highly communicative and integrated project team, leading to better decisions.

Improved Constructability

Ensure designs are practical and buildable, reducing risks during construction.

Higher Quality Deliverables

Produce more accurate and reliable construction documents.

Minimized RFIs & Change Orders

Proactive resolution reduces the need for information requests and costly variations.

Our Difference

Why Choose Us for BIM Coordination & Clash Detection?

A coordination engineer marking up an issue on a tablet beside a wall screen showing a building model

Audience

Who Can Benefit?

General Contractors

Subcontractors (MEP, Structural, etc.)

Architects & Engineers

Project Managers

Developers

Relevant Case Studies

This service in practice

Projects that demonstrate this service in practice โ€” full detail in the Case Studies section.

72nd Street Station โ€” BIM Model Conversion & Redesignย โ€” A legacy NYC transit station’s design data was converted into a fully coordinated, COBie-compliant BIM environment built for decades of asset management.

MEP Coordination โ€” Modern School Facility (27,000 Sq Ft)ย โ€” Fully coordinated MEP BIM models delivered a virtually clash-free installation and real cost savings on a budget-constrained school modernization.

Natatorium & Recreation Center โ€” MEP BIM Coordinationย โ€” Below-slab MEP coordination resolved the highest-risk plumbing conflicts on a $30M natatorium before construction began.

University Residential Dormitory โ€” BIM Coordination & Structural Engineeringย โ€” A structured, repeatable BIM coordination workflow drove down RFIs across two 9-story dormitory towers with identical floor plates.

Contemporary Art Museum โ€” Structural Engineering & BIM Coordinationย โ€” Principal-led structural engineering and BIM coordination brought a $45M museum’s V-column structure and fully curved faรงade to life without losing a single irreplaceable panel to a field conflict.